Das Passive House: Taking A German Approach

What is a “Passive House”? A passive house comes from the concept of an ultra-low energy building, using 90% less heating and cooling than your typical built home.  First becoming a mainstream idea in the 1970’s, passive home construction is making a comeback in the United States as “green architecture” and Global Warming hit center stage in the building industry.  Wolfgang Feist, a German physicist, set the first definitive bar in 1996 with the creation of the Passivhaus Standard.  Although there are surprisingly few mandatory requirements in this German standard, the Passivhaus calls for extremely strict performance criteria. (see PH requirements below) There is little question that alternative energy and active green building systems are the future of the United States and the world as a whole.  However the journey must unavoidably begin with making more efficient buildings first and foremost.     5 Key Elements (Breakdown of a Passive House) 1. Super Insulation

  • R-value minimums:  Typical cold climate R-values =  Walls: R40-60 Roof: R50-90 Sub-Slab: R30-50  (PH requirement =  U < 0.15 W/m2K,  Uw < 0.8 w/m2K )
  • No thermal bridging:   (PH requirement =  < 0.01 W/mK )   Thermal bridging occurs when a conductive material in the building envelope "bridges" thermal heat or cold between the inside and outside of the building.
  • Continuous Insulation:  Although there are many passive house envelope options, continuous insulation serves as the primary concept/strategy against thermal bridging.

  wall_insulation     2. Air Tight Construction Air tight construction is critical for passive houses to work. Air leaks are not only the biggest contributor to loss of energy but also infiltration of moisture, which effects the indoor humidity. (PH requirement =  must be below 0.6 air change/hr at 50 pascals )     3. Highly Efficient Windows Although not cheap or easy to find in the United States, triple glazed windows are an important building block to the success of a passive house.  It's also important that the windows have "warm edge" spacers and super insulated frames. Good window U-values fall between 0.2 - 0.3 with low-e coatings and Argon gas.  (PH requirement =  3-pane glazing,  Ug < 0.8 W/m2K,  g-value = 50-55%)   4. Mechanical Ventilation with Heat Recovery Because of the strict requirements for air-tightness in a passive house, proper ventilation is critical in order to exchange stale indoor air with fresh outdoor air. (PH requirement =  mechanical heat recovery > 75% ) 5.  Solar Orientation & Shading Control The building's orientation on its site in regard to window placement and shading is one of the most efficient passive strategies to maximize the control of solar heat gain.  Although building orientation is not a Passivhaus requirement, it is a strategy that can have dramatic effects on the heating and cooling loads needed to maintain interior thermal comfort.   (PH requirement =  heat energy demand: < 15 kWh/m2a,  maximum heating load < 10 W/m2, frequency of overheating < 10%) Most of the building's exterior glazing should be located within 30 degrees of true South, gaining heat passively in the winter time.  Shading control in the form of roof and/or window overhangs, louvers, etc should by designed to block the steeper sun angles in the summer.  To supplement, building elements with thermal mass such as masonry or concrete can also be used to increase the effects of the passive solar heating by absorbing the solar gain and slowing releasing it for hours.         Local Case Studies

  Links & Resources

       

January 30, 2013

Kent State University CAED New Facility Competition Roundup

After posts the previous two days on our team's modeling process for the Kent State College of Architecture and Environmental Design's new building, see Alan + Philip's joint post on the in-house model making process and Andrew's story of his experience on the level of collaboration between Bialosky + Partners Architects and Architecture Research Office, we thought it be proper to share a few pictures of the final model.  The model, and other media, is now on display (along with the other three team's proposals) in the first floor of the Kent State University Library, through February 15th. Watch the video of the BPA + ARO team public presentation here: https://ksutube.kent.edu/playback.php?playthis=g929c9yz2 A recap of the public presentations, courtesy of Kent State: http://www.youtube.com/watch?v=gzl1JAZreno Press coverage of the CAED design competition:

A collaborative model between Bialosky + Partners Architects and Architecture Research Office on display at the Kent State U. Main Library through February 15th.

January 18, 2013

KSU CAED Presentation Images

Bialosky + Partners Architects with Architecture Research Office are excited to share a few examples of the work our team has produced for the interview and public presentation for Kent State University’s new College of Architecture and Environmental Design. To see the entire display, please be sure to visit the exhibition being held in the first floor of the Kent State University Library starting January 18th. Check the Bialosky + Partners Cleveland Design Blog for updates about our team's design process, project technology and other continuing information. First Floor Plan Auditorium Studies Wall Section   Fin Orientation View of Ground Floor View of Studio Level View of Third LevelView of Northwest Entry